Develop a complete work breakdown structure for a small gas station…

  

Develop a complete work breakdown structure for a small gas station… Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawings are attached at the end of this document. Table 1 provides work units that need to be finished to complete the project.  Develop work packages and include the respective work units as a secondary level of the WBS.  Develop a unique numeric tracking system for work packages and work units.  Draw an AON diagram properly sequencing the construction of the primary work packages (e.g., 1st level of the WBS). (2) Asphalt Paving for P&S Area(3) Concrete Hardstands in P&S Area(4) Concrete Foundations(5) Walls-Masonry Bearing Walls(6) Walls-Prefab Metal Sandwich Panels(7) Interior Concrete Floors(8) Built-up Roof(9) Roof Gutters/Drainage(10) Interior Built-ins (e.g., Cabinets, etc.)(11) Interior Painting(12) Interior Drywall(13) Interior Doors, Frames, Hardware, etc.(14) Interior Floor Coverings (if reqr’d)(15) Exterior Brick Façade(16) Exterior Glazing(17) Exterior Doors and Signage(18) Mechanical Systems(19) Electrical SystemsMechanical System Individual Units(1) Excavation of waste water system(2) Drainage tile installation – waste water(3) Septic tank installation(4) Fresh water lines (piping)(5) Sinks, basins, and toilets installation(6) Hot water system installation(7) Pneumatic air system installationImage transcription text7. Develop a complete work breakdown structure for a small gas station project for which simplified plans andconcept drawings are attached at the end of this document. Table 1 provides work units that need to befinished to complete the project. Develop work packages and include the respective work units a… Show more… Show more Business Management Project Management CECM 669

Don't use plagiarized sources. Get Your Custom Essay on
Develop a complete work breakdown structure for a small gas station…
Just from $13/Page
Order Essay
  

Leave a Reply

Your email address will not be published.

Related Post

Open chat
💬 Need help?
Hello 👋
Can we help you?